........Our MacGregor Index Page.......................... Ruth Canvas Mods Index.
...... ...............................Previous Page.......................................
Next
Page If There Is One
.................................................................--- Netting - Part IV ---
.......
Here the top of the pop-top is finished.
.......
The netting had to be hung on the boat and one area at a time pinned in place and...
.......
....sewn to the structure.
.......
Here the top and back are done, but not the port side.
.......
Ruth would sew the netting to the structure along one whole seam then..
.......
... we would hang it and pin the other 3 seams in place so...
.......
...that it would fit all the curvatures going on. Here the pop-top area is almost finished except for the starboard side (arrow).
.......
A better view of the ....
.......
... zippered doorway that allows me to go forward on the boat if needed.
.......
And a view of the back zippered door.
.......
Here the main netting is....
.......
... being pinned to the starboard side of the boat.
.......
One thing that doesn't show in the pictures is that at the very end Ruth sewed a 12 inch wide strip of bare netting to the very bottom where the arrows like. It just hangs down past the rub-rail for some added protection.
.......
The final 3 areas needing netting.
.......
The cockpit is done.
.......
...as well as the last three small areas shown.
.......
Now the job of attaching the cockpit area to the cabin area.
.......
A lot of material that has to...
.......
....go under the arm of the sewing machine. It took both of us to get this done, but was one of the fastest parts of the whole deal.
.......
About done!!!!!!!
.................................................................................. Next Page If There Is One